Exterior painting in Las Vegas takes a beating from the sun
Exterior painting in Las Vegas has to stand up to intense sun, summer highs above 110°F and dust storms during the monsoon season, which runs from mid-June through September. South and west walls fade and chalk first, and trim and garage doors in direct sun often show wear before the stucco does.
Every surface is washed first to remove dust and chalk. Coatings are matched to each surface: high-quality acrylic or elastomeric coatings on stucco, and durable enamels on fascia, doors and metal. Hairline stucco cracks are filled and sealed before painting, since monsoon rain can get into them and work behind the finish.
Block walls need their own approach. Porous concrete block soaks up paint and can show white efflorescence from sprinklers and ground moisture, so it is cleaned and primed with a masonry primer before the finish coats.
